Since 2015 we have been processing project documentation in models using the BIM (Building information Modeling) methodology. We also use the BIM methodology during the construction itself and step by step we carry it out into all other phases of the implementation.
|
BIM - Building Information Modeling
BIM Advantages
Control during the entire project lifecycle |
Error elimination |
Time saving |
Cost savings |
BIM Usage
Clash detection is a large benefit of the BIM modeling process. Tools for project creating and administration provide us clash detection already during the design work. Both visual control and control using automatical functions where collision spots may be detected after having defined specific conditions and tolerances and afterwards they may be solved efficiently. |
A digital model may be used for simulations of construction scheduling where it is possible to follow up how the building will look at a specific moment when the time schedule is kept. And also other construction-related parameters may be monitored. |
As each element of the model contains information about its geometry (and not only about the geometry), quantity take-offs may be created. They may be used for building estimates and consequently for quantity check during the buildup. |
With the help of a 3D model, coordination among individual collaborators involved in the construction process may be relatively easily and efficiently solved, both during the design and buildup works. |
An integral part and advantage of BIM is visualization. The model serves as a presentation tool for dealings with the developer. Presentation possibilities range from 3D renders up to virtual reality displays. |
With mobile applications, we eliminate many paper documents during the entire buildup process. The whole project may be browsed on a smartphone or a tablet in digital form. |